Dossier 271 - Laying down of a new water pipe and pump at Tullabeg

Zone d'identification

Cote

IE IJA FM/TULL/271

Titre

Laying down of a new water pipe and pump at Tullabeg

Date(s)

  • 10 December 1948-4 November 1960 (Production)

Niveau de description

Dossier

Étendue matérielle et support

84 items

Zone du contexte

Nom du producteur

Histoire archivistique

Zone du contenu et de la structure

Portée et contenu

File relating to the laying down of a new water pipe and pump at Tullabeg and to (4 November 1960) fire prevention plans. Includes correspondence between the Fr Michael Connolly SJ, Rector, Fr Tom Scully SJ and Fr Patrick Cunningham SJ and various suppliers and a series of letters to the Rector from O’Gorman Quinn and Company, Fire Protection Engineers, Dublin relating to fire engines and extinguishers.

Appraisal, destruction and scheduling

Accruals

System of arrangement

Zone des conditions d'accès et d'utilisation

Conditions d'accès

Conditions governing reproduction

Language of material

    Script of material

      Language and script notes

      Caractéristiques matérielle et contraintes techniques

      Finding aids

      Zone des sources complémentaires

      Existence and location of originals

      Existence and location of copies

      Related units of description

      Descriptions associées

      Zone des notes

      Identifiant(s) alternatif(s)

      Mots-clés

      Mots-clés - Sujets

      Mots-clés - Lieux

      Mots-clés - Genre

      Zone du contrôle de la description

      Identifiant de la description

      Identifiant du service d'archives

      Rules and/or conventions used

      Dates of creation revision deletion

      Langue(s)

        Écriture(s)

          Sources

          Accession area